Institutional

UBC Beaty Biodiversity Centre Expansion

Key Details

Owner:

UBC Properties Trust

Mechanical Consultant:

AME Group

Architect:

Shape Architecture

General Contractor:

Etro Construction

Project Delivery:

Design Assist

Date Project Finished:

August 2025

Leed:

Targeting LEED Gold

This project was an expansion to the existing UBC Beaty Biodiversity building, utelising the University of British Columbia’s  District Energy System heating as the source of heat for the new building. Extensive use of 3D Building Information modelling and planning was required for coordination in tight corridors, through the mechanical shaft, and on the rooftop.

The mechanical systems include:

  • Storm Drainage System
  • Condensate Drainage System
  • Sanitary System
  • Irrigation Water System
  • Lab Water System
  • Domestic Water Distribution System
  • HVAC System
  • Fire protection system
  • Plumbing fixtures and drains
  • Appliance Hookups