Institutional

UBC Recreation Centre North

Key Details

Owner:

UBC Properties Trust

Mechanical Consultant:

AME Group

Architect:

Shape Architecture

General Contractor:

Etro Construction

Project Delivery:

Design Assist

Date Project Finished:

June 2025

Leed:

Targeting LEED Gold

The mechanical scope includes demolishing works to disconnect existing mechanical system, Life Building Enabling Works, DES works for interior and exterior life building, supply and install of a complete operational mechanical system for the main recreation north – main building. Division 15 utilized 3D modelling and offside fabrication to help with schedule, maximize efficiencies, and reduce waste. Utilizing 3D modelling minimized conflicts on site as clashes were detected and resolved ahead of time in the virtual space.

The mechanical systems include:

  • Storm Drainage System
  • Sanitary System
  • Domestic water distribution system
  • HVAC System
  • Fire protection system
  • Controls
  • Plumbing fixtures and drains
  • Appliance Hookups