District Energy

UBC NDES Wesbrook Place – BCR9 DES Expansion

Key Details

Owner:

Corix Utilities

Mechanical Consultant:

Kerr Wood Leidal Associates Ltd.

Project Delivery:

Lump Sum

Date Project Finished:

June 2023

Supply and installation of the Distribution Piping System (DPS) connecting from the existing system up to the BCR9 building