District Energy

Alexandra DEU Phase #3, Stage 1

Key Details

Owner:

City of Richmond

Mechanical Consultant:

Kerr Wood Leidal Associates Ltd.

Architect:

Dialog

General Contractor:

Stuart Olson Construction Ltd.

Project Delivery:

Bid Spec

Date Project Finished:

2015

Awards:

2016 VRCA Silver Award of Excellence

We are proud to have earned the 2016 VRCA Silver Award of Excellence for this project.

The project scope included the installation of new supply and return mains, extensions from existing mains to two new fluid coolers and pumps. We also installed two new distribution pumps, providing new plant controls and expanding the District Energy Utility (DEU) piping to the existing geothermal system in the same neighbourhood.

Additional scope included the construction of one energy transfer station (ETS) in a new residential complex connected to the utility.  The ETS was provided complete with brazed plate heat exchangers, and associated controls.