Commercial

Molson Coors Brewery

Key Details

Owner:

Molson Coors

Mechanical Consultant:

Omicron

Architect:

Omicron

General Contractor:

Smith Bros. & Wilson

Date Project Finished:

December 2018

The HVAC scope included seven major AHUs, five MUAs, nine RTUs, eleven air conditioning units and extensive ductwork throughout the facility. The plumbing scope included a 12” diameter water entry room, 6” diameter domestic water distribution through the facility including the office spaces, labs, complete washroom groups and capped future connections. The controls scope included full DDC control of the building’s HVAC system.