Key Details
Owner:
City of Vancouver
Mechanical Consultant:
FVB Energy INC.
General Contractor:
Division 15 Mechanical Ltd.
Project Delivery:
Lump Sum
Date Project Finished:
March 2021
About The Project
Division 15 Mechanical Ltd.'s scope is to install the District Energy piping for the heating system on the City of Vancouver, including the installation of around 700 of 10” welded, pre-insulated steel hot water pipes for the main pipe, as well as smaller buried and interior piping for the connection of each of the seven buildings and future connections between the 3RD Ave and 6Th