District Energy

City of Surrey Energy Transfer Station Expansion

Key Details

Owner:

City of Surrey

Mechanical Consultant:

FVB Energy Inc

Project Delivery:

Lump Sum

Date Project Finished:

October 2024

Supply of an ETS which is shop-fabricated, packaged and skid-mounted, complete with integrated controls and energy metering system

The distribution piping system consists of the installation of underground pre-insulated piping at two out of three ETS locations