Institutional

Lions Gate Hospital Power Plant Replacement

Key Details

Owner:

Vancouver Coastal Health

Mechanical Consultant:

Dialog + HH Angus

Architect:

Dialog

General Contractor:

Division 15

Project Delivery:

Lump Sum

Date Project Finished:

In progress

Awards:

2021 VRCA Silver Award of Excellence

3D laser scanning of existing tunnels and mechanical rooms allow for 100% mechanical BIM and extensive off-site prefabrication.

Divisions 15's scope also includes a triplex of architecturally aesthetic exhaust flues rising 125’ above grade, new medical oxygen, nitrous oxide, medical vacuum, medical compressed air plant, and general compressed air plants.

Extensive service tunnel piping was required to connect the new plant equipment to the existing piping distribution network.

Two new water to water Energy Transfer Stations (ETS) in the terminal building mechanical rooms will replace existing steam to hot water ETS.

3D laser scanning of existing tunnels and mechanical rooms will allow for 100% mechanical BIM and extensive off-site prefabrication. This will result in significantly reduced site impact on the fully functional hospital.

Other features include new plant controls fully integrated into the existing complex and complete plant switch-over  to make way for the new acute care tower that is currently under design.