Institutional

Langara Heating Plant Extension

Key Details

Owner:

Langara College

Mechanical Consultant:

Prism Engineering

General Contractor:

PCL Constructors Westcoast Inc.

Project Delivery:

Lump Sum

Date Project Finished:

July 2023

Awards:

2024 VRCA Silver Award of Excellence

Division 15 performed the mechanical installation within an active campus while maintaining operation of the building HVAC systems with minimal service interruptions.

The District Heating system reduced GHG by 25% which is very significant for an institution of 700,000 sq. ft.