Key Details
Owner:
YVR - Vancouver International Airport Authority
Mechanical Consultant:
Associated Engineering
General Contractor:
Hall Construction
Project Delivery:
Lump Sum
Date Project Finished:
February 2021
About The Project
The YVR CORE Program is a multi-phase, sustainability-focused infrastructure upgrade project involving, among many other things, a new Central Utilities Building, which will have one of the largest GeoExchange systems in Canada. Division 15's scope is to install the District Energy piping loops for the heating and cooling systems, including the installation of around 2KM of 16" welded, pre-insulated steel hot water pipes and the same length of 34" fused HDPE chilled water pipes for the main loop, as well as smaller piping for the connection of each of the four building around the terminal.